Case Studies

Zinga Cold Galvanized Steelwork Case Study – TPS Runcorn Zinga Cold Galvanzing Steel Beams

Zinga Cold Galvanized Steelwork Case Study – TPS Runcorn

Completed in 2012, the Thermal Power Station is one of the largest Energy from Waste facilities in the UK. TPS Runcorn has the capability to treat up to 810,000 tonnes per year of solid recovered fuel which is derived from household waste. This reaches the site by both road and rail.  At full capacity Runcorn can supply…

Keim War Memorial Restoration, Loch Ness

Promain’s technical team recently made contact by HRI Munro Architecture. This was in regard to a war memorial restoration on the shore of Loch Ness.  After receiving a grant by the Centenary Memorials Restoration Fund, the architects were looking to restore the design on the memorial. They therefore enlisted the help of Promain’s knowledgeable technical…

Swimming Pool Paint Specification At Legoland Windsor

Swimming Pool Paint Specification At Legoland Windsor

One of the prestigious projects in Promain‘s portfolio is the renovation of the splash zone at the award winning Legoland hotel in Windsor back in 2014. Promain had contact by Orientrose Contracts Ltd. The Contractor Originally, the pool area was designed by waterparks and leisure pool designers Neuman Aqua Ltd. Neuman Aqua’s vision consisted of…

Atocha Station Intumescent Railway Fire Protection Atocha Railway

Atocha Station Intumescent Railway Fire Protection

Promain provide a huge range of infrastructure intumescent railway approved products from global manufacturers such as Sika, Sherwin Williams and PPG. Recently, PPG have specified and applied intumescent coatings to Atocha Railway Station in Madrid. The Client ADIF (Administrador de Infraestructuras Ferroviarias) Location Madrid, Spain Challenge To provide long-lasting and reliable fire protection, corrosion protection…

Sika Garage Floor Paint at Ferrari Manchester Ferrari Garage Floor Paint

Sika Garage Floor Paint at Ferrari Manchester

Recently, one of Promain’s largest manufacturers Sika provided high end garage floor paint to Ferrari in Greater Manchester. The vehicle workshop involved in the repair and maintenance of some of the world’s most expensive cars. Sika provided a durable, high gloss floor to protect the high-powered, high-specification machines it services. Specification Of course, the Ferrari…

Anti Slip Paint For Southern Railways Selhurst Depot Railway

Anti Slip Paint For Southern Railways Selhurst Depot

Promain‘s colleagues at Sika were contacted by Southern Railway to provide a system specification. This was for for the renovation of their train inspection pit. There were a number of conditions the coating would need to allow for, especially requiring a safe anti slip paint surface for warehouse staff. Selhurst Depot is under operation by…

Sika Renovation of Chatterton Water Tower, Spalding Chatterton Water Tower

Sika Renovation of Chatterton Water Tower, Spalding

One of Promain’s leading manufacturers of industrial paint coatings and concrete repair, Sika, have been busy specifying products for the Chatterton Water Tower in Spalding. Introducing Chatterton Water Tower Chatterton Water Tower has served the Spalding area for the last 62 years. However, over the last few years residents had expressed concern about its dirty…

Renovating Limestone Steps At Neasden Temple Hindu Temple

Renovating Limestone Steps At Neasden Temple

Promain‘s team were contacted by the team at a prestigious Hindu temple in Neasden, London for advice on how to protect the limestone stair entrance. BAPS Shri Swaminarayan Mandir, Neasden, London Built entirely using traditional methods and materials, the Swaminarayan Mandir has been described as being Britain’s first authentic Hindu temple. Holding the Guinness World…

Using Bedec Barn Paint To Renovate a Go Karting Centre

Using Bedec Barn Paint To Renovate a Go Karting Centre

Last Summer, Promain were contacted by Rogue Leisure to provide paint and building repair materials for their newly purchased warehouse. Rogue Leisure wanted to utilise one half of the unit as a go karting circuit. The other half was a bowling alley as they had out grown their previous premises. Read on to find out…